6th Ave. Corridor Study
More than just a roadway, the 6th Avenue Corridor is a vital link through Stillwater and serves as a connection between various sections of the community. The corridor study will examine how best to develop better north/south connections and maximize human scale development in areas adjacent to 6th Avenue.
About this Page
This page is meant to function as the hub of civic engagement for this project. Feedback is shared with City Council and city staff. Comments made on this page, as well as any comments made to city staff through email, are considered public documents. For questions about this, click on "Who's Listening."
More than just a roadway, the 6th Avenue Corridor is a vital link through Stillwater and serves as a connection between various sections of the community. The corridor study will examine how best to develop better north/south connections and maximize human scale development in areas adjacent to 6th Avenue.
About this Page
This page is meant to function as the hub of civic engagement for this project. Feedback is shared with City Council and city staff. Comments made on this page, as well as any comments made to city staff through email, are considered public documents. For questions about this, click on "Who's Listening."
-
Share on Facebook Share on Twitter Share on Linkedin Email this link
-
Share on Facebook Share on Twitter Share on Linkedin Email this link
-
Share on Facebook Share on Twitter Share on Linkedin Email this link
-
Share on Facebook Share on Twitter Share on Linkedin Email this link
-
Share on Facebook Share on Twitter Share on Linkedin Email this link
-
Share on Facebook Share on Twitter Share on Linkedin Email this link
-
CLOSED: This survey has concluded.Share on Facebook Share on Twitter Share on Linkedin Email this link
-
CLOSED: This survey has concluded.Share on Facebook Share on Twitter Share on Linkedin Email this link
-
CLOSED: This survey has concluded.Share on Facebook Share on Twitter Share on Linkedin Email this link
-
CLOSED: This survey has concluded.Share on Facebook Share on Twitter Share on Linkedin Email this link
-
CLOSED: This survey has concluded.Share on Facebook Share on Twitter Share on Linkedin Email this link
-
CLOSED: This survey has concluded.Share on Facebook Share on Twitter Share on Linkedin Email this link
-
CLOSED: This survey has concluded.Share on Facebook Share on Twitter Share on Linkedin Email this link
Follow Project
Level of Engagement
Inform: Give information to the community
Consult: Get feedback from the community
Key Dates
-
March 10 2021
-
March 31 2021
-
March 29 → April 02 2021
-
August 25 2021
-
November 29 2021
Planning Process
-
Phase 1
6th Ave. Corridor Study has finished this stageProject Kick-off, Research & Analysis
-
Phase 2
6th Ave. Corridor Study has finished this stageVision, Input + Direction
-
Phase 3
6th Ave. Corridor Study has finished this stageDraft Plan + Evaluation
-
Phase 4
6th Ave. Corridor Study is currently at this stageFinal Draft Plan
Documents
-
Advisory Committee Meeting #1 Presentation (01.26.2021) (5.81 MB) (pdf)
-
Advisory Committee Meeting #2 notes. (14.3 MB) (pdf)
-
Public Meeting #1 Visual Preference Boards (38.9 MB) (pdf)
-
Hwy51-6th Ave Planning Commission_2021.04.06.pdf (20.1 MB) (pdf)
-
6th Avenue Crossing Locations (694 KB) (jpg)
-
Advisory Committee Meeting #4 (26.7 MB) (pdf)
-
Proposed Complete Active Transportation Map (2.04 MB) (pdf)
-
Public Meeting #2 flyer (1.29 MB) (pdf)
-
Public Meeting #2 Presentation (9.47 MB) (pdf)
-
Advisory Committee Meeting #5 10/20/21 (27.9 MB) (pdf)
-
November 29, 2021 City Council Study Session Presentation (12.7 MB) (pdf)
-
Stillwater Draft Report (18.3 MB) (pdf)
-
Advisory Committee Meeting #3 March 10, 2021 (14.3 MB) (pdf)
Related projects
Who's Listening
-
Phone 405-742-8443 Email rian.harkins@stillwater.org -
Phone 405-742-8219 Email jenika.birdsong@stillwater.org